Construction Plan Design

Construction Layout

Construction Surveying
  • Preparation of existing conditions of the future work site, including topography, mapping of wetland resources, existing buildings and physical features
  • Stake for clearing property, construction phases (excavation, setting footings)
  • Stake out reference points and elevation references that will guide the construction of new structures
  • Verify the location of structures during construction;
  • Preparation of As-Built Plans: at the end of the construction project, verify that the work authorized was completed to the specifications set on plans.